Skip to main content
FREE Delivery!|(512) 412-3378

Upshur County, Texas ยท Free Delivery

Bulk Aggregates for Patios in Gilmer, TX

Free delivery to Gilmer on every order, with loads arriving in as fast as 2 business days.

Delivering to Gilmer, TX

Free delivery on every order.

  • Free delivery to Gilmer
  • Order from 1 ton
  • As fast as 2 business days

Gravel delivered to Gilmer

Crushed gravel and base materials that compact under tires.

Flex Base

3/4" minus blend compacted under roads and heavy-load areas

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Gilmer

Rock & Stone delivered to Gilmer

Graded crushed stone for drainage, concrete and heavy work.

RipRap

4" to 12"+ rock for shorelines, slopes and culvert outlets

From 1 Ton Delivered, FREE to your Doorstep

Cost per ton lowers the more you order!

Free delivery to Gilmer

Decorative delivered to Gilmer

Rounded stone for beds, borders and water features.

Sand delivered to Gilmer

Washed sand for masonry, concrete and leveling.

Soil, Fill & Mulch delivered to Gilmer

Soil and fill by the ton, mulch by the cubic yard.

How delivery to Gilmer works

  1. 1

    Pick the material and quantity.Open a product to see your price, with free delivery to Gilmer.

  2. 2

    Choose a delivery date at checkout.As fast as 2 business days for most Gilmer addresses.

  3. 3

    Clear a drop spot.The truck tips the load where you mark it. Note low wires or branches when you order.

Not sure how much you need?

Enter length, width and depth and the calculator returns the cubic yards and tons for your project.

Open the calculator

Contractors and homeowners in Gilmer both call Texas Rock Supply for gravel and aggregate delivery in Gilmer, TX. Whether you are laying a paver patio for a client or building your own backyard pad, the material under the surface decides how long the work holds up. Most jobs here start with Flex Base, the local name for the crushed limestone that Texas builders rely on as a stable foundation.

Expansive clay across the Blackland Prairie and much of north and central Texas shrinks and swells with the season. That movement is why base depth and drainage carry the job, not just the look of the top layer.

Materials for Gilmer Projects

For patios and flatwork, the bedding layer sits directly under the pavers or flagstone and gives them a level, stable seat. Stone screenings, often called screenings, are the standard choice for this layer. The fine, angular particles lock together when compacted, so your pavers do not shift underfoot or after a hard rain. Use them at a depth of about 1 inch over a compacted base.

That base layer is where Flex Base does its work. This crushed limestone is the default base material across Texas. It compacts into a firm, dense slab that spreads the load from foot traffic, patio furniture, and seasonal clay movement. For heavier use, like a driveway leading to the patio, Grade 1 or Grade 2 flex base gives you the same stability at a greater depth.

If you are pouring a concrete patio slab, washed sand, also called concrete sand, provides a clean, level bed that helps the slab cure evenly. For a permeable patio or a dry creek bed that drains runoff away from the house, #57 limestone gives you open voids that let water pass through quickly.

Ground and Conditions in Gilmer

The main threat to a patio in Gilmer is not frost. It is water and clay. Expansive clay across the Blackland Prairie and much of north and central Texas shrinks and swells with the season, which is why base depth and drainage carry the job. When clay gets wet, it expands and pushes upward. When it dries, it shrinks and leaves a void. A thin base cannot resist that movement, so the patio settles, cracks, or heaves.

Heavy downpours and flash flooding on the Gulf Coast make the problem worse. Water that pools under the patio softens the subgrade and turns the clay into mud. The fix is a base thick enough to bridge the movement and a drainage layer that carries water away. For most patios, that means a compacted Flex Base layer at least 4 inches deep, with a slope that sends surface water clear of the slab.

Work runs year round in most of Texas; wet spells, not cold, are what stop a base job. If the ground is saturated, wait for it to dry out before you compact. Building on wet clay traps moisture and guarantees movement later.

Delivery to Gilmer and the Surrounding Area

Ordering bulk material for a Gilmer project starts with a quick estimate of how much you need. You can order by the ton or by the cubic yard from Texas Rock Supply. Use the calculator on each product page to convert your patio dimensions into the right quantity.

Once you place your order online, we schedule a delivery to your site in Gilmer, Upshur County. We also deliver to nearby communities including Big Sandy, Diana, and Ore City. Have the drop zone ready before the truck arrives. A level spot close to the work area saves you time moving material by wheelbarrow.

How to Get the Right Bedding for Your Patio

Start by measuring the patio area and deciding on your base depth. A 4-inch Flex Base layer with a 1-inch screenings top is a solid starting point for most residential work. Order a little extra to account for compaction, which settles the material by about 25 percent. Texas Rock Supply can help you confirm the quantity before you check out.

What gravel is best for a driveway in Gilmer?

Flex Base is the best choice for a driveway in Gilmer. It compacts into a firm, stable surface that holds up to vehicle weight and the seasonal movement of expansive clay. Spread it in layers, wet it down, and compact each pass. For a top coat that is easier on tires and feet, add a layer of driveway gravel over the compacted base.

How much material will my project need?

Measure the length and width of the area in feet, then multiply by the depth in feet to get cubic feet. Divide that by 27 to find cubic yards. Because compaction reduces volume, add about 25 percent to your total. For a 10 by 12 foot patio at 4 inches deep, you need roughly 1.5 cubic yards of base material before compaction.

Order your Flex Base, stone screenings, or #57 limestone online today. Texas Rock Supply delivers bulk material by the ton to Gilmer and the surrounding area, sized to your project.

Frequently Asked Questions

Common questions about gravel and aggregate delivery in Gilmer, TX

What gravel is best for a driveway in Gilmer?

Flex Base is the best choice for a driveway in Gilmer. It compacts into a firm, stable surface that holds up to vehicle weight and the seasonal movement of expansive clay. Spread it in layers, wet it down, and compact each pass. For a top coat that is easier on tires and feet, add a layer of driveway gravel over the compacted base.

How much material will my project need?

Measure the length and width of the area in feet, then multiply by the depth in feet to get cubic feet. Divide that by 27 to find cubic yards. Because compaction reduces volume, add about 25 percent to your total. For a 10 by 12 foot patio at 4 inches deep, you need roughly 1.5 cubic yards of base material before compaction. Order your Flex Base, stone screenings, or #57 limestone online today. Texas Rock Supply delivers bulk material by the ton to Gilmer and the surrounding area, sized to your project.

How do I schedule a delivery to Gilmer?

Place the order with the date you want and we confirm the delivery window back to you. Give us as much notice as you can for Gilmer so you get the slot you want rather than the one that is left, and tell us up front if the site is only reachable at certain times.